Dubai completes 85% of world’s largest waste-to-energy project

Supplied

The world’s largest waste-to-energy project, taking shape in Dubai, is now 85 per cent complete.

The first phase of the Dubai Waste Management Centre will be ready next year, while the entire project is scheduled to finish by 2024.

The facility, located in Al Warsan area will convert 45 per cent of Dubai's municipal waste into renewable energy once complete.

It will be able to process 1.9 million tonnes of waste annually and generate enough energy to power 135,000 homes.

Once fully operational, the plant’s renewable energy, generated from treating waste, will feed the local electricity grid with 215MWh of clean energy.

Through two of its five treatment lines, the centre will commence its initial operations at 40 per cent by early 2023.

It will process 2,000 tonnes of solid waste to produce 80MWh of renewable energy at this stage.

Covering an area of 400,000 square meters, the facility’s generator and steam turbine, a key technology in producing electricity, have already been installed.

The centre will rely on state-of-the-art Japanese and Swiss technologies for the treatment process that will ensure any emissions are environmentally friendly and odour-free.

The centre will receive around 1,000 truckloads of waste daily, with a capacity to accommodate 88 trucks per hour.

Through five treatment lines, it will have the capacity to process 5,666 tonnes of solid municipal waste per day.

Burnt waste will produce around 1,000 tonnes of bottom ash, which will be recycled and used in infrastructure projects.

Dubai Municipality has launched an e-platform to exchange recyclable and reusable materials for reducing the quantities of waste produced and raising the percentage of waste diverted from landfills.

More from UAE

  • Abdullah bin Zayed attends meeting on Syria in Riyadh

    His Highness Sheikh Abdullah bin Zayed bin Sultan Al Nahyan, UAE Minister of Foreign Affairs, joined foreign ministers from the region and elsewhere in Riyadh, Saudi Arabia, on Sunday, at the first regional meeting on Syria since President Bashar al-Assad was ousted last month.

  • UAE delivers 3,000 tonnes of aid to Lebanon

    The second UAE aid ship arrived at Beirut Port on Sunday loaded with 3,000 tonnes of relief supplies, as part of the “UAE stands with Lebanon" campaign.

  • UAE Embassy in Beirut to reopen, President congratulates new leader

    President His Highness Sheikh Mohamed bin Zayed Al Nahyan held a phone call on Saturday with Joseph Aoun, congratulating him on his election as President of Lebanon.

  • New bridge opens on Dubai's Sheikh Rashid Road

    Dubai's Roads and Transport Authority (RTA) has opened the second bridge as part of Phase 4 of the Al Shindagha Corridor Improvement Project, facilitating traffic flow from the intersection of Al Mina Street and Sheikh Rashid Road to the intersection of Sheikh Khalifa bin Zayed Street and Sheikh Rashid Road.