Sharjah announces remote working for government employees

File Picture

The Sharjah Department of Human Resources has announced remote work system for all government employees in view of the rising cases of COVID-19.

The move will come into effect from February 14.

The government departments will be allowed to decide on the percentage of people required to work from home, and those who will need to be in the office.

If remote working is not possible, shift systems can be introduced so only 50 per cent of the staff are present at one time.

All offices must maintain the highest level of COVID-19 safety regulations, with each worker seated two metres apart.

More from UAE

  • Abdullah bin Zayed attends meeting on Syria in Riyadh

    His Highness Sheikh Abdullah bin Zayed bin Sultan Al Nahyan, UAE Minister of Foreign Affairs, joined foreign ministers from the region and elsewhere in Riyadh, Saudi Arabia, on Sunday, at the first regional meeting on Syria since President Bashar al-Assad was ousted last month.

  • UAE delivers 3,000 tonnes of aid to Lebanon

    The second UAE aid ship arrived at Beirut Port on Sunday loaded with 3,000 tonnes of relief supplies, as part of the “UAE stands with Lebanon" campaign.

  • UAE Embassy in Beirut to reopen, President congratulates new leader

    President His Highness Sheikh Mohamed bin Zayed Al Nahyan held a phone call on Saturday with Joseph Aoun, congratulating him on his election as President of Lebanon.

  • New bridge opens on Dubai's Sheikh Rashid Road

    Dubai's Roads and Transport Authority (RTA) has opened the second bridge as part of Phase 4 of the Al Shindagha Corridor Improvement Project, facilitating traffic flow from the intersection of Al Mina Street and Sheikh Rashid Road to the intersection of Sheikh Khalifa bin Zayed Street and Sheikh Rashid Road.